PEC Consulting has been hired to do a conceptual study for a Greenfield cement manufacturing facility in South America.
A Feasibility Study for the optimization of a cement grinding facility in North America is underway. The study includes a review of the current operation, identification of bottlenecks, and recommendations to increase the capacity of the grinding facility.
Further studies are taking place for a lime production facility in South America. PEC Consulting has been studying several scenarios to use two different sizes of kilns to maximize production and fuel efficiency. Results and recommendations have been provided in a Report indicating the most viable scenarios.