PEC Consulting has completed the valuation of a major cement plant in Central America. Two of our senior consultants traveled to our client’s plant and studied the existing equipment and facilities. These services were performed using the “Replacement Cost” methodology and PEC Consulting used a database of recent projects for equipment and installation costs. Our estimating department provided the necessary information to define current costs of major structures.

PEC Consulting has initiated the Bidding Process for the implementation of a Waste Heat Recovery system at a cement plant in Central America. The project called for a Feasibility Study to assess the waste heat and power generation potential, design criteria, flow sheets with estimated process parameters, arrangement drawings, economic analysis, and tie-in arrangement of electric power for the new system. A comprehensive Report including our findings and recommendations was presented to our Client’s Management and consequently gained their approval to proceed with the project.